Writes about energy policy and the distance between what a decision says and what it does to a bill.
MarketsThe commission found PJM followed its tariff when it dropped the Virginia nuclear, fuel-cell and gas hybrid from the current study cycle, but told the grid operator to work harder with developers.
GridGSR037 restructures definitions into a table and renumbers Section J. The justification is that a hard-to-navigate standard slows down every other code modification.
MarketsJudge Chutkan found the EPA acted without congressional authority. Rhode Island had already ruled the termination procedurally unlawful. A third suit by 22 states was dismissed in January.
NuclearTX-1 in Oak Ridge is built and moves to equipment installation. At 700,000 pebbles a year it would fuel up to eleven Xe-100 reactors - one of which has a customer and a site.
AnalysisSpain's cheapest storage sites are old mines. TRISO-X has a 40-year licence before it has equipment. A court restored $7bn. And Ofgem approved a rewrite justified by drafting speed.
AnalysisFERC declines a contract dispute and points at November. DOE funds reconductoring because rights of way already exist. AEMO reports a record and warns about delivery dates.
GridContinuum Industries joins the Climate Change Investment Initiative cohort; the fund does not disclose amounts but typically writes equity cheques between $100,000 and $300,000.
StorageThe market operator's annual report pairs the record connection figure with a warning: reliability now depends on investment arriving on schedule, not on the total being large.
RenewablesNava Limited's subsidiary MSEL, 65% Nava and 35% ZCCM, completed the $90m Sinazongwe project a year after groundbreaking; ZESCO takes the full output.
PolicyThe SPARK initiative covers 26 states and $5.25bn in total; the department expects 23 GW of added capacity from upgrading existing transmission rather than building new lines.