Victoria will make new data centres bring their own power
Rules released on 22 September require new data centres to match new electricity demand with new renewable generation and storage rather than drawing on the existing grid.
Contributing writer
Writes about energy policy and the distance between what a decision says and what it does to a bill.
Rules released on 22 September require new data centres to match new electricity demand with new renewable generation and storage rather than drawing on the existing grid.
Terra Fusion of Baltimore is reviving a confinement approach sidelined for fifty years, on an experimental reactor at the University of Maryland built from secondhand MRI scanners and repurposed brewing equipment.
Greenvolt owns it, Renovatio Solar is building it and CATL supplies the technology, with completion reported within 12 months. Another 500MWh of projects moved elsewhere in Central and Eastern Europe the same week.
A 202(c) emergency order let PJM call on specified resources and use backup generation as a last resort before or during an EEA 3, in force for one day.
Newsom approved bills directing the CPUC to examine data centre energy use, requiring payment of infrastructure upgrade costs and removing blanket environmental exemptions.
Analysis of 70 dwellings and a 42-apartment building in South Australia finds north-facing maximises self-sufficiency only below about 1.4 kW, with east-west better above it.
A $30 million second-window award under California's Microgrid Incentive Programme includes three Lake County projects pairing solar with pumped hydro in firefighting water tanks.
A federal judge in Rhode Island ruled the EPA acted outside its statutory authority in ending already obligated Solar for All grants, in violation of the Administrative Procedure Act.
The PUCT adopted large-load rules without the proposed $50,000/MW non-refundable fee, set a flat $100,000 study fee and extended the missed-milestone notification window to 24 months.
The New York PSC cleared the Propel NY transmission project on 17 September; opponents argued cancelled offshore wind made it unnecessary, but regulators said the state's statutory targets were unchanged.