Writes about energy policy and the distance between what a decision says and what it does to a bill.
AnalysisOn its third-quarter call, Edison International asked for a liquidity source and a shareholder liability cap, and put a $300 million price on elevated credit spreads for SCE's 2027 bonds alone.
AnalysisLevelTen's third-quarter data put a €17 premium on solar paired with batteries in Spain, as curtailment in the first half tripled; standalone prices are nearing the floor for financing.
The BriefThe Korean cell maker reported KRW 4.69 trillion in revenue and KRW 407.8 billion operating profit, driven by grid storage and data-centre backup units, and is converting US lines to LFP.
GridThe Grid SCALED funding opportunity splits up to $50 million for refurbishment and reuse and up to $187 million for domestic materials and subcomponents; concept papers are due 20 November.
RenewablesTen projects in Puglia, Lazio, Basilicata and Molise were refused on landscape and heritage grounds; five agrivoltaic plants in Puglia received positive environmental opinions.
NuclearUnit 1 has been off since 28 July and unit 2 since 12 August; a local rise of about 10 cm in the intake basin is not yet enough, and the level must hold and rise for several days.
PolicyThe set covers exposure and continuous reporting, LNG data and bilateral deals with energy-intensive consumers, with a new transaction reporting manual, Q&As and data formats.
RenewablesThe $330 million site completes Series 6 Plus thin-film modules begun overseas; First Solar expects about 17 GW of US module capacity in 2027 and 500 jobs are already filled.
StorageA decree requires grid-forming mode and synthetic inertia; the tender awards 1,050 MVA with curtailment of up to 500 or 750 hours a year and a four-hour minimum duration.
MarketsContracted large loads rose 22% to 84 GW, led by a 10.4 GW data centre campus in Ohio; gas generation spending rises to $20 billion and a 702 MW Bloom fuel cell project for Google is under way.