Moving power, not making it: a $2.8 billion loan and three other signs of the same limit
The US Department of Energy's Office of Energy Dominance Financing announced on 17 November a conditional loan commitment of up to $2.8 billion for Grid United's Wyoming Intertie. The project would add about 1.8 GW of transfer capacity, double existing transfer capacity between the Southwest Power Pool and the Western Electricity Coordinating Council regions, and, by DOE's estimate, deliver up to $39 billion in electricity cost savings across 17 states. DOE stresses that the commitment shows intent: the project still has to meet technical, legal, environmental and financial conditions before the loan closes.
The same week's other news describes the same limit from different sides. At FERC, grid operators filed rules for connecting data centres, and several - CAISO, MISO and NYISO - offer services for loads that accept being curtailed when transmission capability is not available. In Italy, an analyst at Solar Media Market Research says developers have crowded into Puglia because wind and solar there produce more than the network can carry out, with 135GWh of storage planned in the region. And Siemens Energy's chief executive told analysts he believes the most advanced nations need to replace about half of their existing grid.

Why it matters
None of these items is about building more generation. The loan pays for a line between two regions, the FERC filings price access to an existing network, and the Italian batteries exist to store what the wires cannot move. Each puts a number on the same gap; DOE's is the only one that still depends on conditions being met.