Analysis
Energy and the grid, read from the primary documents
AnalysisFour items from 6 and 7 October show how long energy decisions take from start to effect — and one, from Thailand, shows what a fast rule looks like when it is designed to be fast.
AnalysisQ3 NEM data put 4-hour batteries at AU$22,000 per MW against AU$8,118 for 2-hour ones. Origin's newly referred Eraring BESS North pairs 500 MW with about 4,942 MWh, roughly ten hours.
AnalysisSpain had 596 negative-price hours in Q2; the same day, Zelestra and EDP added 462 MWh of batteries to Spanish solar plants under contract. One report describes the problem, the other a business model built on it.
AnalysisOn 5 October, DOE offered up to $4.2 billion to get more out of existing reactors and Poland moved its first new unit to 2036. One buys hundreds of megawatts on existing sites; the other is a decade-long build.
AnalysisFive US stories from one week show the money for new plants coming from very different places, and one federal programme withdrawing it from farms.
AnalysisFour stories from three continents this week turn on the same scarce thing. Where it is scarce, projects shrink to fit it; where it is plentiful, as in Brazil, price decides.
AnalysisFERC ruled on who pays for a plant that ran zero hours; Poland is funding batteries through capacity contracts and grants; Fraunhofer measured what 20 GW of storage would have done to prices.
AnalysisFrance's spreads, Germany's new battery rules and India's 50 GWh budget all reward shifting power in time. Japan and Denmark show the other side: too many batteries waiting for too little grid.
AnalysisSouth Korea counts curtailable access, Maharashtra makes storage a connection condition and Virginia asks utilities to measure utilisation. None of it needs new wires first.
AnalysisThis week PJM's data-centre capacity procurement stalled at FERC over who pays, and Spain's draft decree ties data-centre grid access to hourly clean power. Same load, two answers.