GridProject Meridien would pair 5,200 MW of solar and 1,500 MW of wind with a 5,000 MWh battery and no external grid connection, feeding a data centre of up to 1,000 MW.
GridThe funding backs advanced reconductoring and dynamic line rating on existing Appalachian Power lines, which DOE says will add about 290 MW of capacity one to four years faster than new lines.
GridUnder its VJV2024 power-plant code, Finland's TSO will make type D plants in weak grid areas add batteries, ES-STATCOMs or synchronous machines sized up to 30% of output; existing plants are exempt.
GridBritain's system operator asked France for help on Friday as wind fell fast, and called up 1,200 MW over an interconnector on Monday when South East transmission stayed out of service.
GridThe forecast puts the average household's transmission charge at £103.24 in 2027/28, 12% of the bill and £20 more than in 2026/27; generators' share stays capped at €2.50/MWh.
GridThe closure report for delivery increments 24 and 25 of the Open Balancing Platform shows both missed the 80% predictability target; storage parameters under GC0166 and the PEF forecast link went live, and the P1-ready platform goal slipped a month.
GridA sod turn in north-west Tasmania marks the ramp-up of the second Bass Strait interconnector; stage 1 of 750 MW is due in late 2030, with converter stations and 90 km of Gippsland cable first in line.
GridUnder FOI-26-208 NESO disclosed six PwC assurance reports on the Strategic Spatial Energy Plan; PwC asks for traceable DESNZ inputs and named approvers, and did not review the Plexos model.
GridBritain's system operator reports September averaged 108 gCO2/kWh with a 95% zero-carbon peak; wind supplied 36.3%, gas 20.5%, nuclear 12.2%, imports 10.8%.
GridThe final modification report of 8 October asks Ofgem to let NESO demand electromagnetic transient models from legacy generators; the Panel backed an alternative that waits for cost recovery.