The BriefSEIA and Wood Mackenzie put cumulative US solar at 299.4 GWdc; Q2 added 11.4 GWdc, up 45% year on year, with developers rushing utility-scale projects ahead of a July safe-harbor deadline.
GridThe New York PSC cleared the Propel NY transmission project on 17 September; opponents argued cancelled offshore wind made it unnecessary, but regulators said the state's statutory targets were unchanged.
MarketsCalifornia's governor rejected an inspector general for the utilities commission on budget and independence grounds, while signing laws that tighten data-center energy reporting and require new rate structures.
PolicyThe funding backs next-generation geothermal technologies and resource exploration — a grant programme aimed at making the heat-under-everywhere resource dispatchable at scale.
RenewablesThe Australian state has opened consultation on a mandatory product-stewardship scheme that would put financial responsibility for end-of-life solar panels on brand owners, aiming to divert thousands of tonnes from landfill.
StorageThe framework runs 2027-2031: 16 GWh committed for 2027 and 190 GWh reserved for 2028-31, disclosed in an Eve Energy filing to the Shenzhen exchange.
NuclearNPCIL began fuel loading at Rajasthan unit 8 on 19 September and at Kaiga unit 1 as it returns from refurbishment, while starting site work for two further Rajasthan units.
GridFraunhofer IEE, for the solar association BSW-Solar, models batteries absorbing peaks at existing transformers — and says the figure is not verified connection capacity.
PolicyA draft amendment to the Electricity Market Act puts consumption sites and storage into ranked groups where capacity is scarce; comments close on 9 October, entry into force set for 1 January 2027.
StorageTailem Bend BESS 3 and Wooreen registered in the market management system on 15 September — a step towards testing, not the same thing as commercial operation.